NewsDetails

How to carry out on-site operation and maintenance of flue gas online monitoring explosion-proof analysis houses?

Most of the flue gas types continuously monitored online by explosion-proof analysis houses are flammable and toxic hazardous gases. Once an explosion occurs, the consequences would be unimaginable. Especially when the analysis house operates under long-term full load, on-site operation and maintenance must be properly carried out.。

How to carry out on-site operation and maintenance of flue gas online monitoring explosion-proof analysis houses??

One、OperateMaintenanceSystemDegree

1、ProfessionalHumanLoad责。Explosion-proof analysis shelter的Installation、professionalPerformanceInspect And OverhaulShouldByAfterexplosion-proofTechnical TrainingelectricalTechnical PersonnelLoad责,OtherpersonnelInvincibleHighlyExpertSelfOperate。Personnel without explosion-proof electrical construction qualifications are prohibited from conducting on-site construction or using open flames.。

2、RecommendationsRemainOperateMaintenanceFile案。From the installation, commissioning, operation, and maintenance of the explosion-proof analysis house to the downgrade of explosion-proof rating, scrapping, and replacement, including all types of explosion-proof electrical equipment inside the house, detailed records shall be made and filed.。

3. On-site operation and maintenance personnel must establish inspection, maintenance, and repair systems for explosion-proof electrical equipment, as well as explosion-proof safety education, technical training, and assessment systems.。

2、DailyOperateMaintenance

SmokeStationOnline MonitoringExplosion-proof analysis shelterUpClassDailyoperationMaintenanceInspect、professionalMaintenanceInspect And safetyTechnologyInspectThreeVarious。Professional maintenance is generally conducted once every six months, and safety technical inspection is conducted once every six months or once a year.。

Daily operation and maintenance inspection is carried out by operating personnel.。ItsmainlyContentIs:

1、ProtectionSupportExplosion-proof analysis shelterDomesticOverseasEnvironment的cleaning,ClearRemoveWith碍equipmentsafetyoperation的ImpuritiesMineral And flammableMineralQuality。

2. Check the gas circuit pipelines to keep them unobstructed and leak-free, check the gas source pressure of the gas supply equipment, with the normal compressed air value between 0.2MPa and 0.8MPa.。

3. The analysis house shall not be subject to external force damage during operation, and there shall be no tilting or component friction phenomena.。The sound should be normal, and the vibration value should not exceed specified limits.。

4. Check the integrity of explosion-proof electrical equipment in each system inside the explosion-proof analysis house, such as explosion-proof air conditioners, explosion-proof gas detectors, explosion-proof audible and visual alarm lights, explosion-proof distribution boxes, explosion-proof lighting fixtures, etc.。

Explosion-proof analysis shelter

6. Check whether the house body has cracks or mechanical deformation phenomena that impair explosion-proof performance.。Cable entry devices should be reliably sealed.。Unused cable entry holes shall be sealed with steel plates with a thickness of no less than 2mm.。The transparent plates of observation windows should be intact and free of cracks.。

7、Positive Pressure Type Explosion-proof Analytical House,RiseInteractionFrontAllRequiredadvanced ventilation Or FillStation,Quiteventilation Or FillStation的TotalQualityachieveEnclosure And PipelineInternalAerospaceAreaTotalAsArea的5DoubleWithSupremeWhen,AbilityStandardAllowEnergizeRiseInteraction,ReversePosition,StopUsersAfter-sales,AlsoShouldextendWhenStopSendRisk。For flameproof type analysis houses, operate the analyzer explosion-proof cabinet according to the above steps.。

8. The various protection, interlocking, detection, alarm, and grounding devices of the explosion-proof analysis house shall be complete and intact.。

9. Check whether the explosion-proof lighting fixtures maintain the integrity of their explosion-proof structure and protective covers as required.。Check that the surface temperature of the lighting fixtures does not exceed the value specified in the product documentation.。

10. The grounding wires of explosion-proof electrical equipment shall be firmly connected, with no loose grounding terminals, no obvious corrosion, no breakage, and no fracture in the outer steel tape of armored cables.。

11. When the explosion-proof audible and visual alarm light alarms, on-site operation and maintenance personnel must promptly troubleshoot the fault. If troubleshooting is not timely or no one handles it for a long time, when the pressure value of the explosion-proof analysis house falls below 50Pa, the power-off interlocking protection will be activated.。

12、on-siteOperateMaintenancepersonnelForDailyoperationMaintenance And Daily InspectionInDevelopOn-site的AbnormalOn-site象UpWithprocessing的Should And Whenprocessing,InvincibleAbilityprocessing的Should And WhenContactExplosion-proof analysis shelterManufacturerAdvanced GullyVentilation。

Relatively speaking, the on-site operation and maintenance of the flue gas online monitoring explosion-proof analyzer cabinet is still relatively simple. Technicians trained in explosion-proof technology can handle daily operation and maintenance, and issues that cannot be resolved can be addressed by contacting the explosion-proof analyzer cabinet manufacturer. Henan Hualong Electric performs very well in after-sales service.

Previous:Advantages and disadvantages of compensation-type and ventilation-type explosion-proof positive-pressure cabinets.
Next:What qualifications must a manufacturer of explosion-proof houses possess?
Scan for Consultation
WeChat QR Code

Sales Manager

WeChat QR Code