Precautions for purchasers of explosion-proof distribution cabinets in pharmaceutical companies
Precautions for purchasers of explosion-proof distribution cabinets in pharmaceutical companies
1.ifWithWithPay AttentionEngineeringdrawingsalsoDemandprovide,FastConvenientEnterpriseProjectengineeraccording toconstructionDiagramDesignShouldProduct;if没WithWithPay AttentionProductdrawingscan be based onNextColumnRelatedPay AttentionKnowledgeComeEnsureStableSupplierQualityinformation;2. Relevant model specifications of the product; 3. The rated power of various controlled equipment motors and the working standard voltage; 4. Requirements for internal components (such as Delixi Electric, Delixi, ABB, etc.) that customers can choose; 5. If a main switch is equipped, please give special notice; if the main switch or branch switches are equipped with leakage protection functions, or if molded case switches are used, please give special notice; 6. Installation method (basic wall-mounted, floor-standing, mobile); 7. Explosion-proof level requirements, protection level equivalent requirements; 8. Size, quantity, and direction of inlet and outlet openings; 9. For outdoor use, please give special notice;10.ifWithanywhatproblem,UpWithdirectly And SupplierLinkedNetwork。

PharmaceuticalIndustryCompanyExplosion-proof Power Distribution CabinetqualityBrilliant的EnclosureStriveAlgorithm
ProcessprocessPerfectBrightMeltOverall:OpenMaterial:ChooseLiquidPressureShearPlateMachine、Etc.DistanceSimensCutCutEtc.facilityAccordingEngineeringdrawingsRegulationsOpenMaterial。Sheet metal bending: Use CNC bending machines for forming.。Welding: Use AC arc welding machines (or AC/DC argon arc welding machines) for welding to ensure the sealing of the welds.。Grinding and polishing: Repair burrs on the surface and inner wall welding areas of the welded products.。Alternatively, use high-precision tool grinders to machine the flameproof joints to ensure their precision.。Drilling and milling: Use specially designed drills and clamping fixtures to drill and mill component screw holes and wire entry/exit holes in the plastic housing.。Each unit product is equipped with a complete set of production-specific workwear, drilling and clamping fixtures, and processing procedures.。Pickling and passivation, phosphating treatment: Clean and treat the surface to ensure surface quality.。static electricityPowder Coating:ChooseChinaFront沿的“髙Pressurestatic electricityDustLastSpray Painting"Processprocess,enhancementPlasticLayerViscousOverallStrength,Resistcorrosionperformance Significantly enhancement。(Stainless SteelMetallurgyMetalSystemQualityInvincibleUsersSupremeColor)Installation:strictaccording to“InstallationsafetyOperating Procedures" And “SupplierQualityInstallationsafetyOperating Procedures"OpenTogetherInstallation。Detection:StrictlySevereaccording toCountryTechnologyStandard And “Product QualityInspectionWithStructureguidanceTrustedUsersCard"Advanced Detection,SupplierQualityinProductionWhen,VariousProcess FlowallWith职IndustryqualityInspectStaffOpenTogetherSafeDuringExtentqualityInspection,VariousVariousDetectionReport告AllprocessingPerfectCompletePlanIntoFileStorage,ProtectionQualityProtectionQuality掌Control的Pursue溯Performance

PharmaceuticalIndustryCompanyExplosion-proof Power Distribution CabinetStructureRegulations:
1.Distribution BoxEnclosureTableAspectsCoatDeepGrayDustLaststate漆。The flameproof joint surfaces of the explosion-proof distribution cabinet are coated with 204-1 replacement-type anti-rust oil.。

2. The insulation material grade inside the junction box of the explosion-proof distribution box is Class II, with an electrical clearance of no less than 6 mm and a creepage distance of no less than 10 mm.。
3. The shell material of the explosion-proof distribution box is made of die-cast aluminum alloy with a magnesium content not exceeding 6% (mass percentage).。
4. The explosion-proof distribution equipment shall be equipped with internal and external grounding device screws. The internal grounding screw size shall not be less than M6, and the external grounding screw size shall not be less than M8.。
5.Explosion-proof distribution boxEnclosurein Significantly ProcessingShouldDistributionWithClear楚、LongRegularPerformance的ConvexThreadStandardIndicate“Ex”。EX——Isexplosion-proofTotalStandardIndicate,英语Explosionp-roof的SimpleCalled。With了TheseOneStandardIndicateThenCertificateBrightShouldIsProductallIsexplosion-proof的,UpWithUsersinSpecialStableriskMarketInvincible
6.Explosion-proof Power Distribution Cabinetexplosion-proofConnectionAspects And MachineShellAsQualityRelatedForShouldSmallTotalWideL And GreaterAerospace隙icmustcompliantGB3836.2-2010InⅡBVariousForTable3、ⅡCVariousForTable4的RelatedPay AttentionRegulations,ConnectionAspectsSupremeTightenScrewWireHole And MachineShellInsideSideAreaDistancelmustcompliantGB3836.2-2010In5.2.6requirements,ConnectionAspectsTableLayerAllValueTableAspectsRoughnessRaInvincibleHighlyexceed6.3μm。
7. The transparent parts of the cabinet window are directly bonded with adhesive into the holes of the cover. The shortest channel from the inside of the flameproof enclosure to the outside through the adhesive-bonded joint surface shall not be less than 10 mm.。
8. All light metal components in the explosion-proof distribution cabinet shall have anti-rust measures, and the surface shall not have coating peeling conditions.。
9.Explosion-proof Power Distribution Cabinet的Operate纵RodSupportMustActualPracticalOperateSensitivityFast,姿DevelopmentDependablyChart, And ShouldShouldWithClear楚的“Class”“Overall”StandardIndicate。
10. The distribution cabinet shall be equipped with a nameplate and warning plate, made of brass plate or other materials resistant to solvent corrosion.。
11. If maintenance is required, professional equipment must be used for repair.。
The above describes the structural requirements of the explosion-proof distribution cabinet. Below, the maintenance of the explosion-proof distribution cabinet is discussed.。
1. First, unpack the packaging of the explosion-proof distribution cabinet product. Strictly follow the information marked on the design drawings and instruction manuals, carefully verify the quantity and specifications, check for correctness, and inspect for any damage or rust conditions. Verify that the accessories and spare parts are complete and effective.。If there is damage, record the damaged locations and extent, or take photos as evidence.。
2. After unpacking, also inspect the product certificate, instruction manual, internal wiring methods, and other technical documents.。After unpacking the high-voltage distribution box, number the distribution cabinets according to the design drawings and move them one by one into the substation installation position to facilitate subsequent assembly.。
3. After placing the explosion-proof distribution cabinet on the channel steel, use thin shims to roughly level the high-voltage box. Then, using one of them as a reference, adjust the others so that the overall panel surfaces of the high-voltage switchgear are consistent and the gaps are uniform.。After fixing with nuts, maintain a gap of 2-3 mm between cabinets, and then permanently fix the cabinet to the foundation channel steel using fixing screws or welding processes.。For aesthetics, the welds should be on the inner side of the cabinet, with no fewer than 4 weld points, each 80-100 mm long.。If there are sharp areas at the welding positions or areas of the distribution cabinet that are easily contacted and may scratch people, use a grinder or fine sandpaper until no obvious prickling sensation is felt when touched by hand.。
4.LinkedWeldingBus-barGroove。The main busbar and instruments in the high-voltage switchgear are provided by the switchgear manufacturer as supporting equipment, or can be fabricated on-site according to the design drawings.。The main busway connection, the connection between the main busbar and the riser busway, and the connection between the busway and the instrument are made with screw connections. At the busway connection surfaces, power compound grease should be applied. The tightening degree of the bolts and the activation state of the connection surfaces are adjusted by using a torque wrench to tighten the anchor bolts to the specified torque value.