Manufacturing process flow for explosion-proof positive-pressure cabinets

The manufacturing process of the explosion-proof pressurized cabinet includes the cabinet body manufacturing process and the assembly process, utilizing technologies such as laser cutting, high-speed electrostatic shot blasting, intelligent self-control systems, and sealing. This article explains the manufacturing process of the explosion-proof pressurized cabinet in detail based on the manufacturing flow of the pressurized explosion-proof cabinet.。

Explosion-proof positive pressure cabinetmanufacturingprocess

Manufacturing process flow for explosion-proof positive-pressure cabinets

Explosion-proof positive pressure cabinet First manufacturingcabinet body,cabinet bodyUsersInInstallationEquippedElectricalComponents And Instruments and Meters,cabinet bodyForGGDCabinetFormstructure,MaterialForCarbon Steel Or Stainless Steel。

1. A 2mm thick steel plate is selected and laser-cut according to the design drawings, with openings and holes made, then fully welded without leakage points to form the cabinet body. After grinding, it is placed in the paint room for high-speed electrostatic shot blasting and plastic spraying. To ensure sealing performance, sealing strips are embedded at the joint between the door and the cabinet body. This is the manufacturing process flow for the explosion-proof pressurized cabinet body.。

2. After the cabinet body is fabricated, assembly personnel perform the initial assembly, which involves installing the panel mechanisms, indicator lights, digital display instruments, and touch screens. Next is the final assembly, which involves installing the internal electrical components and instruments, typically using base plate mounting or crossbeam mounting. External components such as the inlet valve, pressure relief valve, and explosion-proof alarm light are installed and interlocked with the self-control system, followed by wiring. The wiring is routed externally to the panel mechanisms to ensure seamless connection. This is the assembly process flow for the explosion-proof pressurized cabinet.。

3. Factory commissioning: Open the inlet valve and connect the gas source and power supply. When the internal pressure of the cabinet exceeds 100 Pa, the self-control system begins normal operation until the internal pressure stabilizes between 100 Pa and 200 Pa. At this point, commissioning is complete, and the positive-pressure explosion-proof function is normal.。Check whether the electrical circuit wiring is correct, whether the operating mechanism is properly connected to the internal electrical components, and perform operational tests on indicator lights, buttons, switches, etc. After no abnormalities are found, submit for quality inspection. After the secondary inspection passes, the factory commissioning is complete.

Previous:Detailed explanation of positive-pressure cabinet explosion-proof levels
Next:Technical data for explosion-proof positive-pressure cabinets
Scan for Consultation
WeChat QR Code

Sales Manager

WeChat QR Code